“The quality of workmanship is excellent and completed in a timely fashion. We have a good working relationship with Stave-con and would not hesitate to use them on any of our schemes.”
Client:
Client:
Location:
Duration:
Value:
Role:
This work was self-delivered by our locally based, in-house resources including adoptable Section 104 foul and surface water drainage with pipes up to 675mm diameter and 131m3 of below ground attenuation.
We constructed a new highway bellmouth under a Section 278 agreement and groundworks for 1 bed maisonettes and 3-4 bed houses.
The infill site was logistically challenging as restricted space reduced the area available for material storage meaning greater use of just-in-time planned deliveries.
The requirement to divert an existing 675mm sewer across a highway while maintaining traffic flows meant use of single lane closure traffic management to maintain traffic flows.
“The quality of workmanship is excellent and completed in a timely fashion. We have a good working relationship with Stave-con and would not hesitate to use them on any of our schemes.”
“I have been extremely pleased with their ability to manage to deliver to our programmes and to an exceptionally high standard. Their effective on and off-site supervision and quality processes has played a key part in their delivery.”
“Stave-Con worked extremely very well within the programmed timescale putting Health and Safety first with no problems settling accounts and their customer care is excellent towards the road users and the residents of Sandwell.”
“Stave-Con’s expertise in both residential groundworks and Section 278 highway work gave us confidence to appoint them for both the civils and groundworks elements of the project, which helped to simplify communications and the coordination of works during the delivery of this scheme.”
“Their undertaking of the work has been exemplary and it was pleasing to see the Section 278 works delivered within programme and budget. I would have no hesitation in recommending them and have every confidence in appointing Stave-Con to future similar schemes.”
“We found their team to be collaborative, proactive and professional throughout including their workmanship, H&S, management of stakeholders and reduction of disruption on the local area. I would have no hesitation in recommending them and have every confidence in appointing Stave-Con to future highways and groundworks projects.”