“The quality of workmanship is excellent and completed in a timely fashion. We have a good working relationship with Stave-con and would not hesitate to use them on any of our schemes.”
Client:
Client:
Location:
Duration:
Value:
Role:
Off-site work included construction of a new road junction on a Section 278 agreement to access the development and, due to Warwickshire County Council’s road space requirements, it was essential that we completed these works on programme.
On-site we built over 2700m of Section 38 spine, estate roads and footways for adoption including a 925m spine road which was used as shared access with other contractors developing adjacent land parcels.
Foul and surface water drainage was under a Section 104 agreement and involved pipes up to 600mm diameter and 5m depths with SUDS attenuation ponds.
The plot groundworks were for 280 new detached, semi-detached and terraced houses and three apartment blocks.
“The quality of workmanship is excellent and completed in a timely fashion. We have a good working relationship with Stave-con and would not hesitate to use them on any of our schemes.”
“I have been extremely pleased with their ability to manage to deliver to our programmes and to an exceptionally high standard. Their effective on and off-site supervision and quality processes has played a key part in their delivery.”
“Stave-Con worked extremely very well within the programmed timescale putting Health and Safety first with no problems settling accounts and their customer care is excellent towards the road users and the residents of Sandwell.”
“Stave-Con’s expertise in both residential groundworks and Section 278 highway work gave us confidence to appoint them for both the civils and groundworks elements of the project, which helped to simplify communications and the coordination of works during the delivery of this scheme.”
“Their undertaking of the work has been exemplary and it was pleasing to see the Section 278 works delivered within programme and budget. I would have no hesitation in recommending them and have every confidence in appointing Stave-Con to future similar schemes.”
“We found their team to be collaborative, proactive and professional throughout including their workmanship, H&S, management of stakeholders and reduction of disruption on the local area. I would have no hesitation in recommending them and have every confidence in appointing Stave-Con to future highways and groundworks projects.”