The Hem

New roundabout for access to a residential development in Telford.

Client:

Vistry Group

Location:

Telford

Duration:

60 weeks

Value:

£1,013,000

Role:

Principal Contractor

Project Overview

These Section 278 highway improvements were for the realignment of a 235m section of the carriageway and construction of a new 4-arm roundabout to provide access to Vistry’s ‘The Rambles’ development in Telford.

In addition 430m of new shared cycleway and footway was built alongside the road and 40m of new access road was constructed into the development.

Stave-Con self-delivered the new drainage, road and footway/cycleway which were constructed ‘offline’ to maintain peak morning and evening rush hour traffic flows on the Halesfield 1 carriageway, as this is the primary route on and off the adjacent industrial estate.

These improvements formed part of a larger works package awarded to us that included the onsite infrastructure and groundworks.